Quality & Compliance

Quality built around an approved specification.

Quality control begins before production. Material structure, artwork, dimensions, features, documentation, and acceptance requirements are confirmed before mass production and checked throughout the manufacturing route.

Quality inspector measuring a flexible packaging pouch

Five-Layer Framework

A practical quality route from specification to shipment.

The exact checks are agreed for the packaging format, material, print method, production partner, packed product, and destination market.

1. Specification Control

Confirm the approved dimensions, material structure, barrier direction, artwork, features, sealing requirements, and acceptance criteria before production.

2. Material & Supplier Traceability

Keep the selected material route, production partner, lot information, and project documentation connected to the agreed specification.

3. In-Process Inspection

Coordinate checks around printing, registration, lamination, curing, slitting, bag making, seals, closures, and visual appearance.

4. Finished Product Inspection

Review agreed functional and visual requirements before packing and shipment, with project-specific inspection and acceptance criteria.

5. Testing & Documentation

Confirm food-contact documents, test requirements, certificates, and reports for the final structure, production facility, product, and destination market.

Compliance Documents

Use conditional, project-specific evidence.

KOTAI coordinates documentation through the selected production route. This page does not represent KOTAI or every production partner as holding a particular certification.

Food-contact documentation

U.S. food-contact or EU documentation may be relevant depending on the final structure, packed product, production route, and destination. Applicability must be confirmed before ordering.

Testing and reports

Project-specific testing can be discussed for barrier, seals, appearance, dimensions, or other agreed requirements. Available reports are confirmed rather than assumed.

Certification evidence

If a certificate or audit document is relevant, verify the certificate holder, facility, scope, validity, and whether it applies to the selected production route and order.

Before Ordering

Confirm the evidence that applies to your project.

For any requested certificate, test report, or food-contact document, confirm the certificate holder, production facility, scope, validity, final material structure, packed product, destination market, and order applicability before relying on it.

Start a packaging conversation

Let's build your next packaging project.

A complete specification is not required. Share the product, pack format, quantities, and what you already know.